Si necesitas completar
en espanol pulsa aqui

GROUND PENETRATION CHECK LIST

 

This Check List should be reviewed prior to penetrating the ground greater than 6 inches anywhere on site. The contractor disturbing soil is required to contact the locater and review as-builts. J.H.A. is encouraged to be submitted prior to commencing all ground-penetrating activities on site. And prior to the start of the work in the field, the supervisor will conduct a Pre-Task meeting with the crew performing the work.

 

If a Job site or Company is missing please contact Moss Safety Manager or Site Safety Representative(SSR)

 

(attach plan)

Excavator/Heavy Equip
Backhoe
Pneumatic Driver (fence posts)
Drilling/Auger
Motorized Saw
Hand Removal (Shovel)
 
Have all known Utilities around the facility been physically located on the ground as applicable? Identify point of origin and point of termination of each line.

Has a ten-foot utility channel “five feeton either side of the known utilities” been marked or delineated with snow fence, orange silt fence or the equivalent where the new work crosses the utility to ensure adequate recognition?

 

IF YES, the areas to be excavated are clearly marked-out and utilities within or near the proposed excavation will be “pot-holed" every 15 feet at a minimum using a vacuum process and protected through backfill operations. If multiple known existing utilities are within or near the proposed excavation, increased potholing will be required as determined on the JHA. Unknown existing utilities may be in the area of the work and excavation shall be done with due diligence, strict adherence to the Job Hazard Analysis (JHA), and awareness to prevent damage to unknown utilities.

 
Cancel  
Please wait.
Processing...